Option: Column Arranged to Receive 1-1/2" Pipe Brace
This option is designed to provide additional structural reinforcement for the column and the sprayhead on a wash fountain. A pipe brace is inserted in the column to receive a 1-1/2" galvanized pipe (by others), which runs through the column ending at the sprayhead.
CALIFORNIA WARNING: Cancer and Reproductive Harm - www.P65Warnings.ca.gov - Learn More about this warning
Downloads
Resource Type
Title
Description
File Size
Action
Submittals
Spec Sheet Option PCB (pdf)
Option: Column Arranged to Receive 1-1/2" Pipe Brace
175 KB
Brochures/Flyers
MGI Corporate Brochure (pdf)
Who we are, Our History, Morris Group International Today